Major Oil Companies
  • Major Oil Company Ð Multi-Site
    • 23 former and operating service station sites in California
    • Vapor Extraction Air Sparging and Bioventing technologies utilized
    • Closure for soils on all sites and ground water on some sites
    • Lump sum prices to closure on each site
    • Total contract value over $2,000,000
  • Major Oil Company - WA
    • Former service station in western Washington State
    • Vapor Extraction technology utilized
    • Lump sum to closure of site soils to MTCA Method A criteria in less than 1 year
    • Closure with the Washington State Department of Ecology
Municipal School District - Washington State
  • Municipal School District - Washington State
    • Operating bus barn
    • Air Sparging and Vapor Extraction technologies utilized
    • Lump sum to closure (MTCA Method A) of site soil and ground water
    • Contracted remedial time frame of 1 year
    • Work on-going with soil cleaned and ground water nearing MTCA Method A criteria
Bank - Washington State
  • Bank - WA
    • Operating convenience store
    • Air Sparging and Vapor Extraction technologies utilized
    • Lump sum to closure (MTCA Method A) for site soil and ground water
    • Contracted remedial time frame of 1 year
    • Contract amount $100,000
    • Work on-going with soil cleaned and ground water at 7.7 ppb benzene (down from > 1,000 ppb)
Manufacturing Facility - Los Angeles
  • Manufacturing Facility - Los Angeles County
    • Lump sum pricing for soil and groundwater closure
    • Total contract was approximately $250,000
    • Vapor Extraction and Dual Vapor Extraction technologies utilized
    • Soil and Groundwater have met cleanup objectives
    • Closure pending with the Los Angeles Regional Water Quality Control Board
Development Company - Indio, California
  • Development Company Ð Indio, California
    • Former service station under an earthen overpass
    • Lump sum to closure on a cost sharing basis
    • Work on-going
    • Contract value of $300,000 - $400,000